28-Item Walkthrough Rehab Cost per Sq Ft Estimator Guide
Flat per-square-foot guesses miss major mechanical tickets like a $6,800 HVAC unit, a $2,800 200A panel, or a $10,000 roof. Itemizing 28 core trades protects your spread.
Itemized Rehab Basis
Rehab Total = Sum(Line Item Quantity x Unit Cost) + Permits & 10% Contingency
Calibration Deals:
Post-Refi DSCR
1.16x
Below 1.25x
Monthly Cash Flow
+$278
+$3,341/yr
Cap Rate
10.30%
NOI $23,699/yr
70% Flip MAO
$196,000
$34,000 over
Cash Left in Deal
$36,932
Refi Net $248,625
1% Rule / GRM
1.35%
GRM 6.2x
Deal Assumptions
$
$
$
$
7x7 Interest Rate vs Vacancy Stress Matrix
10/49 cells pass DSCR >= 1.25xClick any scenario cell to inspect exact monthly cash flow and lender coverage. Emerald cells clear both positive cash flow and your DSCR bar.
| Rate \ Vac | 0% | 3% | 5% | 8% | 10% | 15% | 20% |
|---|---|---|---|---|---|---|---|
| 5.50% | |||||||
| 6.00% | |||||||
| 6.50% | |||||||
| 7.00% | |||||||
| 7.50% | |||||||
| 8.00% | |||||||
| 8.50% |
Annual Operating Statement & Debt Service
- Gross Scheduled Income
- $37,200
- Effective Gross Income
- $35,340
- Operating Expenses
- -$11,641
- Net Operating Income
- $23,699
- Monthly Debt (P&I)
- $1,224.16
- Total Cash Required
- $94,900
Educational mathematical modeling worksheet only; not financial, tax, lending, or legal advice.
Reference Scenario Benchmarks
| Scenario | Inputs | Result | Underwriting Note |
|---|---|---|---|
| Light Refresh ($8-$15/sf) | Paint, trim, mulch, minor bath | $14k-$24k (1,600 sf) | Fast 2-to-3 week rent-ready turn |
| Cosmetic Turn ($20-$32/sf) | LVP, counters, appliances, paint | $32k-$52k (1,600 sf) | Core BRRRR and retail refresh scope |
| Full Gut ($45-$75/sf) | Roof, HVAC, panel, PEX, kitchen/bath | $72k-$120k (1,600 sf) | Major systems replacement plus permits |
Field Verification Checklist
- 1 Walk exterior roof, siding, foundation, and electrical panel first before admiring interior cosmetics.
- 2 Multiply big-ticket systems (HVAC, water heater, kitchen, bath) by unit count on 2-to-4 unit buildings.
- 3 Always keep a dedicated permits, dumpsters, and 10% contingency line item.